Why Electrical Quotes Differ So Much

Three quotes for the same job can differ by a factor of two. Usually it is because they are not the same job.

BeydilliBright Ltd. 3 min read
Tower Bridge and the London skyline at sunset

Getting three quotes for electrical work frequently produces three very different numbers, and the natural conclusion is that somebody is overcharging.

Sometimes that is true. More often the quotes describe different pieces of work in similar language.

Scope is the main variable

The same request produces different scopes depending on what each person assumes is included.

For a consumer unit replacement, one quote may cover the board and the labour to fit it. Another may include testing every circuit beforehand, remedial work on anything found, full testing afterwards, certification and notification.

The second is roughly twice the work. It is also the one that does not end with a board that will not stay switched on.

Making good

The largest single difference on rewiring and cabling work.

A quote that excludes plastering and redecoration is substantially cheaper than one that includes it — and the excluded work still has to be done and paid for by someone. When comparing quotes for anything involving chasing walls or lifting floors, establish who is making good.

Materials

Accessories and fittings vary in price by a factor of several. So do consumer units, cable and protective devices.

There is a genuine difference in quality, particularly in accessories that get used repeatedly and in LED fittings where driver quality determines life. There is also a point beyond which you are paying for appearance, which is a legitimate choice but not a safety one.

Certification and notification

Notifiable work carried out through a competent person scheme carries a cost — registration, certification, notification. A quote that omits all of that is cheaper and leaves you without documentation for work that legally requires it.

How the unknown is handled

Older installations produce surprises. Different quotes handle that differently: some include contingency, some quote the optimistic case and vary it later.

The optimistic quote looks better and frequently is not. The useful question is what happens when something unexpected is found — and whether you will be consulted before additional work is carried out.

Business costs

Insurance, scheme registration, calibrated test equipment, vehicles, and the time spent quoting jobs that do not proceed. These are real costs, and a business that carries them properly cannot match one that does not.

How to compare properly

Ask each quote the same questions:

  • What testing is included, before and after?
  • What certification will I receive, and will the work be notified?
  • Is making good included?
  • What materials are specified?
  • What happens if something unexpected is found?
  • What is explicitly excluded?

The answers usually explain the difference entirely — and occasionally reveal that the cheapest quote was the best value after all.

Ask us anything

If you have a quote from us and want to understand what is in it, ask. We would rather explain it than have you guess.